受电力约束、利用率差距和运营成本上升影响,企业和运营商开始重新思考AI基础设施的建设和衡量方式,关注点从GPU增长转向效率。
Power constraints, utilization gaps, and rising operating costs are pushing enterprises and operators to rethink how AI infrastructure is built and measured.